Positive Environmental Impact
No Salt. No Chemicals. Reduced Emissions.
Safety Enhancement
Icy conditions and Infrastructure deterioration mitigation.
Downtime Reduction
Up to 15 min. from hazard detection to full operational capabilities.
Energy Saving
Integrated real-time weather analysis = up to 60% lower consumption.
Seamles Integration
Turn-Key solution integrated to common construction process.
Low maintenance
Robust, and patented ribbons with a 15-year guarantee
INSTALLATION PROCESS
OUR COMPLETED PROJECTS
SNOWLESS systems were installed in multiple countries and applications, below are some examples.
-
BASt Test Section
- Location: Germany
- Installation: 2022
- Application: Asphalt
- Heating Power: 210 KW
- Heated area: 2,000 m²
- Heating zones: 6 different heating zones
-
Maxima Hospital
- Location: Eindhoven, NL
- Installation: 2018
- Application: Asphalt
- Heated area: 700 m²
-
Truck Loading Dock
- Location: Eindhoven, NL
- Installation: 2020
- Application: Concrete
- Heating Power: 210 kW
- Heated area: 2,000 m²